Tuesday, January 28, 2020

Thailand’s power tunnel almost 70 per cent complete

Dec 04. 2019
Facebook Twitter

By The Nation

Construction of the biggest underground tunnel to house electric cables in Thailand is now 69 per cent complete, officials announced today (December 4).

The tunnel expected to be fully completed in 2020 and will be ready to connect with the railway system. Measuring 3.6 metres in width and located 30 metres underground, it will connect Chidlom and Lumpini and Chidlom and Sukhumvit. A security system for both flood and fire along with drainage and ventilation are going to be installed. The tunnel will help reduce the risk of high voltage incidents in the event of accidents and flooding while also increasing electricity capacity in the business area.

Tags:
Facebook Twitter
More in News
Editor’s Picks
wmg-logo
Top News
wmg-logo