In a filing to the Stock Exchange of Thailand, the company said that under the 15-year contract, the company is committed to excavate and transport waste from the main pit of Hongsa Power's lignite mine. The quantity of the waste is estimated at 383 million cubic metres.
Hongsa Power operates a 1,878MW power plant in Hongsa, Laos, which will be fuelled by locally-sourced lignite.