The spokesman of the Flood Relief Operations Centre said Tuesday that the repairing of the five-metre damaged part of the big-bag floodwall in Don Mueang was done at 3 am.
Gen Palangkul Klaharn, the FROC spokesman, said troops started fixing the damaged part at 11 pm Monday.
The five-metre part allowed floodwater to overflow it and boats could pass over the spot, the spokesman said.
The Nation