Tensions boil over at flood scheme hearing

SATURDAY, NOVEMBER 23, 2013
Tensions boil over at flood scheme hearing

Samut Songkhram residents express anger at govt officials, leading to a premature end to the event

A melee occurred at a public hearing yesterday in Samut Songkhram on the effects of the government’s Bt350-billion flood-prevention and water-management programme, after a large number of protesting residents angrily pressured government officials in charge of the scheme.
This prompted a premature end to the event, before local vocational students attempted to prevent the officials from leaving the venue.
More than 10,000 residents in the province’s Mae Klong area, where floodway structures under the programme would replace their homes and vast areas of farmland, attended the session to oppose the project.
Officials from the Water and Flood Management Commission had, however, expected only 800 to attend, with most of them allegedly having been prepared, for Bt800, to show their approval for the construction of the floodway structures.
The Mae Klong area, as the main sea outlet accommodating major rivers east of Bangkok flowing southward, is a key location for the structures, which are part of the flood-prevention and water-management scheme on the west side of the Chao Phraya.
Commission member Apichart Anukularmphai explained the importance of the Mae Klong area, and especially the difference between general floodway structures in other areas and a special structure called a flood-diversion channel, which he said would use less space and entail less land expropriation.
The opposing residents began attacking the floodway projects during a question-and-answer session, saying they would not tolerate the “neck-deep inundation” a so-called new river would bring, after already regularly suffering knee-deep flooding annually.
They also said the entire flood programme was a failure before it had even begun, and the government should not have brought suffering from one area to another – in this case, Mae Klong.
The residents, speaking long after the Q&A session, also accused the commission of bringing in 800 people to the hearing venue – Samut Songkhram Technical College in Muang district – to answer a questionnaire approving the project, in return for Bt800 allegedly promised to each of them. 
 
Questionnaire fails
They said the questionnaire illegally failed to give details on the effects and negative aspects of the floodway structures.
Locals opposed to the structures began making a noise when Apichart and other commission members were unable to answer several questions posed to them. 
Samut Songkhram Governor Chonchuen Bunyanusart and Surajit Chirawate, a provincial senator, who brought along 22,434 signatures of the opponents, proposed calling a vote as a final conclusion, which was supported by an overwhelming number of raised hands and led to a premature end to the public hearing and relevant events.
A group of vocational students belonging to the college later formed a human chain to prevent Aphichart and other commission members from leaving the compound, prompting about 50 policemen and 100 civil defence volunteers to escort the commission’s motorcade. 
A group of residents attempted to give the list of opponents’ signatures to Apichart, but was stopped by the police from doing so. The confrontation ended when police negotiated with lecturers from the college, who convinced the students to cease their efforts. The motorcade then left the area.
The students later set off ping-pong bombs and lit firecrackers, reportedly out of anger because of the police intervention. There were no immediate details about when the next mandatory public hearing session in the province would be held.