As of 8am, the Mekong was measured at 12.25 metres, about 25cm beyond the critical point and was only 75cm from the banks.
The Thoranit Narumit floodgate, the last stop before Lam Nam Kam would pour into the Mekong, opened all its four gates but was not fast enough to drain floodwater.
Lam Na Kam has overflowed resulting in the flooding of many villages in Tambon Piman of Na Kae district and large areas of farmland.