no-article

In Focus

Riding through a picture postcard in Muak Lek

MONDAY, JULY 27, 2020
|
The Nation
Play

The 20-storey-high railway bridge in Saraburi’s Muak Lek district will soon have tourists enjoying picturesque scenery as they travel through the district.

Riding through a picture postcard in Muak Lek
The bridge, being built as part of a Northeast railway project, is 4.8 kilometres long and 49.5 metres high. Riding through a picture postcard in Muak Lek Construction is 70 per cent done and the bridge should be in full operation by 2024.

Riding through a picture postcard in Muak Lek Riding through a picture postcard in Muak Lek Riding through a picture postcard in Muak Lek
 

Related

'Speeding' motorcycle rider plunges 6 metres down hole on Thonburi road

September 08, 2022

Military trucks on standby at 11 Bangkok districts to transport commuters

September 07, 2022

Constitutional Court chief orders probe into ‘leak’ of witness’ statement

September 07, 2022
  • TAGS
  • railway
  • train
MOST VIEWED
1.

Thai athletes triumph at 33rd SEA Games, secures record 14th overall Gold medal title

2.

Cold weather expected across Northern and Northeastern Thailand, less rain in the South

3.

Behind the victory at Hill 350: Second Army commander praises fallen heroes

4.

Army's message to Cambodia: Will continue operations until 3 conditions met

5.

Strict Control on “Liger” and “Tigon” Designated as Controlled Wildlife, Ownership Must Be Reported

nationthailand

© 2025 All rights reserved., The Nation
Privacy Policy