
The sinkhole, which was about five metres in diameter, or two lanes, and around 2 metres deep, opened up at the Rama IV intersection around 7:45 pm Sunday night.
The Bangkok Metropolitan Administration managed to filled the hole and pave the road with asphalt and reopened the spot to traffic by 5 am Monday.
Jumpol said the sinkhole would not affect the subway because the system had very good protection system.
The Mass Rapid Transit Authority of Thailand also announced in a press statement that the sinkhole had no effect on the subway station at the Lumpini Park because the station was about 20 metres underground.
The Nation